Inspection Guideline (Working Document)
Group C: Best-Practice Inspection
Goal is to identify defects in the EER diagram based on given scenarios:
(1) Model requirements (represented as scenarios) are considered to be correct.
(2) EER diagram contains defects.
Please follow the individual steps of the workshop accordingly:
11:00-12:00 Tutorial
- Preparation
- Complete Experience Questionnaire (Google Forms)
- Get material
- Inspection Guideline (as hardcopy; please fill in your matriculation number)
- Scenarios (as hardcopy)
- EER Diagram (as hardcopy)
- Your laptop (optionally: connect to a lab screen)
- Tutorial “Parking Garage”
- Download the Parking Garage Data Capturing Sheet Template (TUWEL)
- Find defects
- When finished, upload your Data Capturing Sheet (TUWEL)
- Fill out the Tutorial Feedback Questionnaire (Google Forms)
12:00-13:00 Break (Please be back in time, we will start at 13:00 st.)
13:00-14:00 Defect Detection (Scenarios 1-4)
- Download the Restaurant Data Capturing Sheet Template (TUWEL)
- Find defects
- When finished, upload your Data Capturing Sheet (TUWEL)
14:00-15:00 Defect Detection (Scenarios 5-7)
- Keep your Data Capturing Sheet
- Find defects
- When finished, upload your Data Capturing Sheet (TUWEL)
- Fill out the Inspection Feedback Questionnaire (Google Forms)
15:00 Study Closure
- Hand over all paper-based material to the course administration
- End of Study.